Permit Issuance
1. For the issuance of each permit...................... $ 20.00

 

2. For issuing each supplemental permit for which the original permit has not expired or been canceled or finaled..................... $ 10.00

 

Unit Fee Schedule

Furnaces
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 kW) ............$ 13.25

For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h (29.3 kW) ...............................$ 16.25

 

For the installation or relocation of each floor furnace, including vent ......$13.25

 

For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater.........................$13.25


Appliance Vents

For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit..$7.00


Repairs or Additions

For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling,absorption, or evaporative cooling system, including installation of controls regulated by this code ....$12.25

Boilers, compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and including 3 horsepower, or each absorption system to and including 100,000 Btu/h (29.3 kW) ...........................................$13.15

 

For the installation or relocation of each boiler or compressor over 3 horsepower (2.24 kW) to and including 15 horsepower (11.9 kW), or each absorption system over 100,000 Btu/h (29.3 kW) and including 500,000 Btu/h (146.48 kW) .............................................$ 24.25

 

For the installation or relocation of each boiler or compressor over 15 horsepower (11.19 kW) to and including 30 horsepower (22.37 kW), or each absorption system over 500,000 Btu/h (146.48 kW) to and including 1,000,000 Btu/h (29.3 kW) ...............................................$ 33.25

 

For the installation or relocation of each boiler or compressor over 30 horsepower (22.37 kW) to and including 50 horsepower (37.3 kW),or for each absorption system over 1,000,000 Btu/h (292.95 kW) to and including 1,750,000 Btu/h (512.66 kW) ...........................................................$ 49.50

 

For the installation or relocation of each boiler or compressor over 50 horsepower (37.3 kW), or each absorption system over 1,750,000 Btu/h (512.66 kW) .......................................$82.75

Air Handlers

For each air-handling unit to and including 10,000 cfm (4.72 m3/S), including ducts attached thereto .......................$ 9.50

 

Note: This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.

Evaporative Coolers
For each air-handling unit over 10,000 cfm (4.72 m3/S) ...............................$ 16.15

For each evaporative cooler other than portable type .....................................$ 9.50


Ventilation and Exhaust

For each ventilation fan connected to a single duct .......................................$ 6.50

 

For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit.................................$9.50

 

For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood...........................$ 9.50


Incinerators

For the installation or relocation of each domestic-type incinerator ........$16.25

 

For the installation or relocation of each commercial or industrial-type incinerator...............$66.50

Miscellaneous
For each appliance or piece of equipment regulated by this code, but not classified in other appliance categories, or for which no other fee is listed in this table ..................................$9.50

  • When Chapter 13 in Appendix B of the Uniform Mechanical Code, 1994 Edition is applicable (see Section 103.0), permit fees for fuel gas piping shall be as follows:

           For each gas piping system of one to five outlets.................... $ 5.00

  

          For each additional gas piping system, per outlet ....................$ 1.00

  • When Chapter 14 in Appendix B of the Uniform Mechanical Code, 1994 Edition is applicable (see Section 103.0), permit fees for process piping shall be as follows:

        For each hazardous process piping system (HPP) of one to four outlets.......... $5.00

        For each HPP piping system of five of more outlets, per outlet $ 2.00

        For each nonhazardous process piping system (NPP) of one to four outlets .....$ 2.00

        For each NPP piping system of five or more outlets, per outlet ........................$ 0.50

 

Back to Top

Other Inspections and Fee

  • Inspections outside of normal business hours, per hour (minimum charge – two hours)..........................$ 30.00*

  • Reinspection fees assessed under provisions of Section 116.7, per inspection .............................$30.00*

  • Inspections for which no fee is specifically indicated, per hour (minimum charge – one-half hour) ............$30.00*

  • Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed, per hour (minimum charge – one-half hour) .........$ 30.00*

*Or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.

Abatements - Building Codes and Fees - Building Forms - Building Permits - Electrical Permits - Mechanical Permits -Commercial Plan Submittals - Residential Plan Submittals - Plumbing Permits - Sign Permits - Uniform Building Codes - Design Standards

 

Privacy Statement/ Refund Policy
Contact Us